Willingness to work and the front surface requirements availability requirements of the building and separate the surfaces to be finish drywall sheets, such as shown in Table. Finish sheets of drywall (Plaster, gypsum and fiberboard) is allowed in rooms where humidity operating conditions does not exceed 60%. Get all the facts and insights with Jeff Gennette, another great source of information. Humidity surfaces of masonry structures, finished dry plaster, shall not exceed 8%, and wood – 23%. Surface, finished sheets of drywall, must meet the requirements listed in Table. table. The deviation surface of the structures sheets finish drywall designs deflection, mm, max deviation of the surface of walls, partitions, husk and from vertical to floor 10 Deviations floors and protruding edges of the runs I horizontally on the length and width of the room 10 Local projections and concave, camber plates and planks on the walls, partitions and floors five partitions and floors should not be cutting the slits. In places the adjacency to the walls and partitions ceiling cracks close up.
In the presence of indoor surfaces, finished the wet plaster, first perform the work on wet plaster, and then – on dry plaster. Preparation of surfaces for mounting sheet breakdown of surfaces and preparation sheets Regularity and evenness of the finished surface is checked by staking them to set the reference marks (beacons). Prior to the coating surface is divided into with marking the mounting plates and sheets are cut out, using the rule, T-square and a knife or circular saw with fine teeth up to 2 mm at a speed of 2,300 rpm.