We differentiate between the following methods Finish: – Method of dry plaster, which plates are mounted on the bearing surface with a special adhesive. – Panels on the substructure, mainly on the surface of the curtain. With this method, dry plaster Make sure that the supporting surface Durable, Non-shrinking, as well as protected against humidity and . Remains of the solution, as well as wax or oil on the concrete formwork should be removed. Fresh, still wet Concrete must be dry. Smooth surfaces (concrete) should be primed Rea Kombikontakt, highly absorbent surfaces (aerated) – Primer Rea Kombigrund. When combining the methods of dry and wet plaster first apply crude.
With a combination of wall and ceiling is recommended that you perform cladding. Wall cladding, dry plaster. As the drywall on the bearing surface (wall masonry, concrete) at using a special glue fastens drywall rigips (producer of Austria), the thickness of 12.5 mm, height is the height of the room. To ensure rapid progress Prepare Sheetrock right size immediately for the entire wall. Before mounting plate to the wall Lay all internal wiring. Junction outlet and switch box is inserted so that they are about 2 cm out from the wall. The order of cladding is shown in Fig. 22.
On the back side plates, trimmed the size of the premises, apply diluted according to instructions (see packaging) glue. In the window frames, sinks, brackets, chimneys, etc. Apply glue to the entire surface of the plates. Mounting / alignment. Plate coated with glue to attach to the wall, knock on it with a rubber mallet and alignment rack and at the same time to align so that the plates fit snugly to each other horizontally and vertically.